The Mercedes-Benz concrete pump truck departured at the BANGBO parking yard on the evening of December 18, 2021.
Several pump trucks can be shipped every month, what is our advantage?
we have Strict Renew Standard for Used Concrete Pump Truck:
1. For each concrete pump, we change the wear parts, such as hopper,mixing motor,grid ,s value, glasses plate, cutting rings, seals,hydraulic pipes,etc .
2. Check and overhaul the oil cylinder, electrical system, hydraulic system and pumping system to ensure that the pump truck will not leak oil. All the systems are in good working condition.
3. After repaired the concrete pump, we will do some cleaning work and Then repaint the concrete machines , so that they will have a good looking.
4. Performance test: conducting about 4 hours of water pumping test to ensure that the pump truck with good performance when delivered to our customers.
Delivery Video☝
When our concrete pump truck arrives at the port, we will ask the freight forwarder to wash the truck before loading it on the ship
If there is any damage to the concrete pump truck during transportation, we will ask the freight forwarder to contact the repairer for repair and replacement.
After the concrete pump truck is loaded on the ship, our freight forwarder will contact the port staff to fix the cargo twice to prevent damage during transportation.
-END-